HOME You are here: Generator Maintenance - Service B
Generator Maintenance - Service B
Generator Service Information and Check list. Each check is verified on the Test Certification copy left on site.
'B' SERVICE
CHANGE
- Engine Oil or Analyse Oil
- Oil Filter Elements
- Fuel Filter Elements
CHECK
| Water Level | Battery Level |
| Antifreeze | Injection Pump |
| Water Hoses/Clips | DCA |
| Tappets | Start/Stop Circuits |
| Fan Belts | Battery Charge Rate |
| Engine Instrumentation | Guards Secure (report missing) |
| Radiator Cooling System | General Inspection of Engine |
| Dynamo Belts | Run Engine On Load, if possible |
| Cold Start Device | Fuel/Oil/Water/Exhaust Leaks |
| Water Trap | Water Temperature Gauge |
| Lift Pump | Oil Pressure Gauge |
| Turbo Oil Feed | Alternator Connections |
| Starter and Dynamo | Relays, Timers, Bases |
| Injector and Pipes | Panel Instrumentation |
| Air Filters | Engine Protection L/Oil, H/Temp |
| Brushes and Slip Rings |
LOAD TEST
- Carry out a one hour load test, using remote load banks
- On completion of the aforementioned, a verbal report will be made to your engineer in charge, which will be followed by the submission of a written report in confirmation, for record purposes, outlining any recommendations.
- Any necessary minor adjustments or repairs, not involving replacement materials or parts, will be carried out under the terms of the Agreement.
- General inspection of engine to include checking for secure guards.
- Test run of engine (on load if available) checking for oil/water leaks, etc.
REPORTS
- Findings to responsible site person
- Complete the test certification, date, sign off.
- Leave Hard Copy with Generator
- General inspection of engine to include checking for secure guards.
- Test run of engine (on load if available) checking for oil/water leaks, etc.
QUALIFICATIONS
Any expendable parts other than oil and oil filters, which are included in the annual maintenance contract, will be chargeable unless there is a separate 12 months all parts warranty in force. e.g. air filters, relays, instruments, etc., will be replaced or arrangements made to replace them and they would be charged extra.
Any major faults found during a service inspection will be reported immediately to your engineer. Charges for repairs to minor faults will be treated separately with labour and the necessary materials to be charged extra.
If a major fault is discovered which requires the attention of the manufacturer's service engineer then their charges are extra and will be passed on to yourselves, unless there is a separate 12 months all parts warranty from PowerContinuity Systems in force, at the time, terms and conditions apply.
PowerContinuity Means Business Continuity




