No break automatic critical power protection

Power Continuity

Power Continuity

Testimonials

Feedback from our customers is very important for us and covers all of these industries:

  • Major Industrial Businesses
  • Global retailers based in the UK
  • Local Councils
  • Emergency Services
  • Banks
  • Insurance Companies
  • Hospitals etc
  • Distributions companies
  • Credit card services

Here is just a small selection of the clients of Power Continuity Systems who currently enjoy power protection that has been designed, built, installed and fully maintained by us:

Mobile Windscreens (UK’s Largest supplier of Windscreens)
“Power Continuity was commissioned to provide our power protection system comprising UPS’s and standby generator. The installation was completed on time, on budget and fitted seamlessly around day-to-day operations.”

Silentnight (UK’s Largest and most famous Bed maker)
“Power Continuity Systems engineers were professional, knowledgeable and worked to Silentnight Group’s requirements for health and safety. They carried the installation out exactly as our original quotation with no overruns.”

NRAT (National Response Emergency Team)
Power Continuity Systems was chosen to design, install and maintain the UPS and generator N+1, supplying resilient power protection (24/7) to the NRAT offices at the Fire Service College.”

Chester Council (Data Centre)
“We chose Power Continuity Systems to provide a stand-by generating set. Not only were Power Continuity Systems on the mark in terms of pricing but the Council were tremendously impressed by their ability to meet an aggressive timescale.”

City Link (National Distribution)
“Knowing that any power failure would damage our ability to deliver our market leading service we chose Power Continuity Systems as our preferred supplier for an automatic fully installed mains power protection system.”

MoneySupermarket.com (UK’s Number One Portal)
We chose Power Continuity Systems as our preferred Supplier. PCS engineers carried out the completed installation on time and within budget. Money Supermarket is pleased to recommend Power Continuity Systems.”

Britannia Building Society (Data Centre Power Protection Systems)
We chose Power Continuity Systems (PCS) to design, supply and install the complete new UPS and Generator power protection systems on the basis of their impressive track record of major installations.

Croda Plc UK Operations (Largest Bespoke Chemical Company in UK & Europe)
Power Continuity Systems have always been an efficient, courteous and above all professional company to work with, providing Croda fast effective support when needed the most.

Walker Crips Group Plc (City of London Stockbrokers)
Walker Crips Group plc is very satisfied with Power Continuity Systems and recommends them as a preferred power protection service provider. Power Continuity Systems continue to service and maintain the power protection systems for Walker Crips.

The Pallet Network Ltd (UK's Largest Logistics Network)
Power Continuity responded to our needs in a timely and professional manner from the outset, and won the business based on not just cost, but also by instilling a confidence in their product and service which they have never failed to live up to since the installation took place. The installation was achieved on time and on budget according to our specification and I wouldn’t hesitate to recommend Power Continuity for anyone’s standby power needs.

Poundland Ltd (UK's biggest discount store)
Power Continuity Systems designed, supplied and installed our fully automatic power protection systems across both our main distribution centres allowing us to operate through any power outage. Poundland would be delighted to recommend Power Continuity Systems for power protection systems for business continuity.

North Kesteven District Council (Total site power protection)
Since installation the Power Continuity Power Protection system has operated flawlessly during a number of power outages enabling us to serve our community whilst nearby buildings endured power failure. North Kesteven District Council would recommend Power Continuity Systems as a trusted power protection partner.

StepNexus (High-security, multi-application smart card platform)
I have been in working relationship with Power Continuity for over a decade. They have managed our UPS and generator requirements supplying, installing and maintaining the UPS and generators to our two IT offices in the Northwest of England, ensuring our credit card transaction operations and financial systems for our global clients are powered at all times. I can confidently recommend Power Continuity as a solid, reliable supplier and experts in their field. Our business operations have never suffered any power issues since Power Continuity.

Burnt Tree Group Ltd (Vehicle Rental)
Power Continuity Systems designed, supplied and installed a 24-7 complete power protection system that protects Burnt Tree’s services day or night, 24 hours a day, 365 days a year. Power Continuity carried out the completed installation, professionally, on time and within budget. Burnt Tree Vehicle Rental is pleased to recommend Power Continuity Systems as a preferred power protection service partner.

Bluefin Group (Leading Insurance Broker)
Power Continuity Systems designed, supplied and installed our resilient N+1, 24-7 automatic power protection systems that protect our infrastructure, 24 hours a day, 365 days a year. Power Continuity carried out the completed installation on time and within budget, to a very high standard. We are very pleased with the flawless operation of the installed power protection equipment and service provided by PCS engineers. Due to some lengthy power outages within the area we installed our generator; the unit has proved to have been critical in maintaining continuity to our business and the refuelling service provided was very efficient.

Dartford Borough Council
Power Continuity Systems designed, built and installed our automatic power protection system, protecting all of Dartford Borough Council Civic Centre operations 24 hours a day with critical power. We are pleased to confirm that Power Continuity Systems performance was true to their commitment, with the project completed within the time frame and no extra costs. Since the implementation of our integrated Power Protection System, it has operated, flawlessly, in anger and ensured that out offices had power, whilst other buildings close by were without power for over 24 hours.

TEVA Global Corporate
It was recognised that we needed more stable power to our site. We already had some localised back-up power equipment provided by generators, however, the generators have a start-up time of around 15 seconds and so are not effective against brown-outs. We also have small uninterruptible power supply (UPS) units to prevent significant impact to sensitive computer equipment, but again they do not cover all equipment to eliminate the impact of the 'brown-outs' we were experiencing. So, it was decided we needed a site UPS to provide full electrical coverage. We worked with a company called Power Continuity to attain a rotary UPS and generator system. This rotary 'flywheel' keeps moving in the event of a power cut and gives the site power for 25 seconds to enable the backup large generators to kick in. In a nutshell, no more brown-outs.

Optical Express
Optical Express chooses its partners carefully. We expect 100% reliability, dependability, together with the very highest level of professional service of our Power Protection partner. During the last 2 decades, Power Continuity Systems have designed, installed and continuously maintained the power protection systems for Optical Express across the UK & Ireland. Power Continuity has been our key partner for almost 20 years of continuous service.

The Imperial Hotel Group
Top management decided to install UPS and Generator power protection systems at the Royal National Hotel first and then rolled Automatic Power Protection Systems across our other Hotels, covering over 3500 rooms. Such a major upgrade of our power systems was not taken lightly. We carried out our own research before choosing our final project partner, Power Continuity Systems. PCS designed each system and liaised closely with the management of each Hotel before implementing the installations. Our experience with Power Continuity Systems has been extremely successful, with each Hotel completed on time and without any cost over runs.

First Data
As the world's foremost Third Party Financial Processtion organization, resilient power systems are an imperative part of our organization, and form part of contractual obligations to our clients. First Data Corporation handles the financial transactions for Lloyds, RBS, MBNA and Barclays amongst other leading banking organizations. Each depends on our 24x7 operational status. A rigorous tendering process began in 2010 to choose which company would replace and upgrade our UPS and Generators systems to ensure they remained effective without any disruption to operations whilst work was undertaken, both on the roof and within the buildings, and our choice of Power Protection System must show a provable return on our carbon footprint. The installation of this 2-megawatt power protection system with resilience had to be the best of the best with no exceptions. Failure at any level is not an option for us or our client base. First Data Corporation chose Power Continuity Systems as the main contractor to carry out this work. They fulfilled our expectations to supply and install the new equipment completely, with the installation and implementation hitting every target date on time and within budget. The completed systems were commissioned, load bank tested and mains fail witness tested on schedule and without any slippage.

Fire and Rescue National Resilience Assurance Team
Having gone through a tendering process and due diligence, Power Continuity Systems was chosen to design, install and maintain the UPS and generator Mk1, supplying resilient power protection (24/7) to the NRAT offices at the Fire Service College. By supporting the establishment of a resilient infrastructure Power Continuity Systems has played an essential part, so that NRAT can provide uninterrupted support in times of emergency. The system installed by Power Continuity Systems has worked according to schedule and supported the infrastructure within the NRAT offices on a number of occasions. This has maintained the services within NRAT and ensured operational continuity.

ALS Food & Pharmaceutical
It was recognised that any power failure at our European Hub Laboratory in Chatteris, Cambridgeshire UK, would damage both our ability to deliver the industry leading service that our Clients have come to rely upon and a detrimental impact on all of our sites across the UK. After consulting with our chosen supplier, Power Continuity Systems, a design for a fully automated mains failure power back up system was agreed upon. Installation of an 800kVA stand by generator combined with a UPS system took place, covering our whole operations, to the agreed schedule by knowledgeable engineers with minimum impact to our business. ALS has now been working continuously with Power Continuity for a number of years. The system has been called upon on various occasions and has proved itself to be robust automatically power protecting all our site operations.